S/N
|
Projects Description | Client | Main Contractor | Date of Contract | Status | |
1 | Project to establish the headquarters offices of the Kuwait Drilling Fluids and Oil Services Company | KNPC | KBCC | 01-07-2024 | Ongoing | |
2 | Construction, implementation and maintenance of infrastructure and road works for the industrial area of Sabah Al-Ahmad Industrial City Project | Ministry of Defense | TECO CONSTRUCT | 29-04-2024 | Ongoing | |
3 | Afra Complex (Hissa Al Mubarak) | Ministry of Defense | International Construction Systems Company for General Trading and Contracting | 01-06-2024 | Ongoing | |
4 | Project to establish, complete and maintain services, infrastructure and public buildings for the suburb center, Al-Mutlaa site | Ministry of Defense | Golden Generations Company | 01-06-2024 | Ongoing | |
5 | CONCRETE WORKS FOR KOC CONTRACT NO .22058615-EXPANSION OF WARA WATER INJECTION SYSTEM IN S&EK AREA- KUWAIT | KOC | MARK TECHNOLOGIES GENEARAL TRADING & CONTRACTING CO W.L.L | 15-06-2023 | Ongoing | |
6 | Construction and construction of Al-Riyadi Stadium in Fahaheel | Ministry of Defense | Kuwait Industrial Centre Co | 28-08-2023 | Executed | |
7 | REPAIR AND REHABILITATION WORKS FOR THE WAVE DEFLECTOR SEA WALL AT SHUIBA OIL PIER | Ministry of Defense | ALKOUT INTERNATIONAL | 23.05.2023 | Ongoing | |
8 | Construction of logistics and transportation warehouses for the US Army, Sabhan | Ministry of Defense | ALHAMRA KUWAIT CO. W.L.L | 05.04.2023 | Ongoing | |
9 | ALWAFRA PROJECT KUWAIT ( PO NO : WJO/PA14-SCO-015 UNITED GROUP ) | Ministry of Defense | ALKHORAYEF COMPANY | 13.09.2022 | Executed | |
10 | EAST SABAH AHMAD HOUSING PROJECT | Ministry of Defense | SINOHYDRO ENGINEERING BUREU 8 CO., LTD | 03.08.2022 | Executed | |
11 | P.272:Limak-Cast - insitu Concrete W | Ministry of Defense | NBTC | 22.08.2021 | Executed | |
12 | Umm Al Hayman Wastewater Project | Ministry of Defense | TEIXEIRA DUARTE COMPANY | 12.12.2021 | Executed | |
13 | CNPC- 2020-154- GC9, GC-10, GC-19,&GC-21 | KOC | ALKHORAYEF COMPANY | 14.07.2020 | Executed | |
14 | GC-19,&GC-21 GC-32 Construction of New Gathering Center for SEK (Main Contract # 17051820) Reinforced Concrete for Pipe Racks, Tanks, Sump Pits, Equipment Foundations | KOC | United Gulf Construction Co. / Petrofac Intl. | 28.08.2018 | Executed | |
15 | ASSIMA PROJECT: Steel Reinforcement works for Assima Tower. | SALHIA REAL ESTATE CO. | Ahmadiah Contracting and Trading Company | 14.11.2017 | Ongoing | |
16 | General Construction works for the Compressors, Utilities and Interconnecting Sub-Areas and EPC for the API Tanks of the EPC&C of Gas Train 5 Project at MAA Refinery. | KNPC | Heavy Engineering Industries & Shipbuilding Co. | 26.07.2017 | Ongoing | |
17 | Manual Excavation for Cable Trenches at Mina Abdulah Refinery as per KNPC /FDH safety Standard, Manual Backfilling works. | KNPC | Integral Services Co. | 26.04.2017 | Ongoing | |
18 | Civil Work at KNPC - Construction works for Crude Units 01 and Unit 21 in Alzor Refinery | KIPIC | Combined Group Company. | 01.03.2017 | Ongoing | |
19 | Manpower Supply for Reinforced Concrete - Shuttering & Steel bar bending and Fixing for Foundations. Manual Back Filling with Compaction ( KOC Compaction Standard). | KOC | Al- Yousifi | 27.02.2017 | Executed | |
20 | Lower Fars Heavy Oil Development Project Phase 1. for Fabrication, Installation of re-bar & Formworks, Casting & Curing for Reinforced Cement Concrete work according to KOC specification, approved drawings & Alghanim/Petrofac/ KOC instruction. | KOC | Alghanim International Co | 7.02.2017 | Executed | |
21 | KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Cable Pulling Works. | KNPC | Kharafi National KSC | 6.02.2017 | Ongoing | |
22 | KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Execution of Clean Fuels Projects - MAA Refinery - Manual Excavation for Civil Construction Works. | KNPC | Kharafi National KSC | 15.01.2017 | Ongoing | |
23 | KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Manual Excavation for Slit Trench Works. | KNPC | Kharafi National KSC | 07.12.2016 | Ongoing | |
24 | KNPC CLEAN FUEL PROJECT: Manual Excavation for Slit Trenches, Manual Backfilling, Manpower Supply for General Labourer, Manpower Supply for Scaffolders, Reinforced Concrete | KNPC | Sayed Hamid Behbehani & Sons Co. W.L.L | 14. 10. 2016 | Ongoing | |
25 | CMEI Works for Manifold group trunk-line system for GC-30 & GC - 31 Order Confirmation - Precast Works for Pipe Supports for Flow Line & Box Culverts for GC - 30 & GC 31 | KOC | Nasser M. Al - Baddah & Partner Gen. Trad | 14.9.2016 | Executed | |
26 | Manual Excavation Works and Backfilling with Compaction as per KNPC Standard for KNPC MAA Location. | KNPC | Wataniya Environmental Services Co | 16.8.2016 | Executed | |
27 | Mechanical, Electrical & Instrumentation ( CMEI) works for ISS 3 Area related to Lower Fars Heavy Oil Development Program (Phase 1) Order Confirmation - Precast Works for Rest Sleepers | KOC | Nasser M. Al - Baddah & Partner Gen. Trad | 04.8.2016 | Executed | |
28 | Manual Excavation in Normal Soil. KOC-LFHOD Export Oil facilities. | KOC | Naser M. Al-Baddah & Partner | 25.09.2016 | Executed | |
29 | Construction of New Export Transit Pipelines from New BS-171 to AGRP MAA - Manual Excavation and Other Civil Works | KOC | Consolidated Contractors Company | 12.08.2016 | Executed | |
30 | Supply of Skilled and Unskilled Labours for Excavation of Slit Trenches | KOC/KNPC | Vision Intl. Gen Trading. / AMEC | 01.07.2016 | Executed | |
31 | Supply of Skilled Manpower for Offshore Work in Sulphur Handling Facilities Project in MAA Refinery | KNPCC | AFCONS Infrastructure Limited | 10.04.2016 | Executed | |
32 | Civil, Structural, Mechanical, Piping, Electrical, Instrumentation & Telecom construction works including Testing and Pre-Commissioning Pertaining to Manifold and associated Subgroup Manifolds for the GC 29-KUWAIT OIL COMPANY (K.S.C) | KOC | O & G Engineering W.L.L. | 10.02.2016 | Ongoing | |
33 | Clean Fuels Project - MAA Refinery, Brown Field Works - Excavation Works for Civil Construction Works | KNPC | Kharafi National Co. / JGSK Joint Venture | 22.11.2015 | Ongoing | |
34 | Clean Fuels Project - MAA Refinery, Brown Field Works - Excavation Works for Slit Trenches | KNPC | Kharafi National Co / JGSK Joint Venture. | 29.08.2015 | Ongoing | |
35 | Excavation and Cable Trenching for KOC Telemetery Project in KNPC | KOC | Al Musairie National Co. / DAELIM | 28.7.2015 | Executed | |
36 | Elevated Substations in SEK - Excavation/Backfilling, Tiles Removal/Laying Works Burgan Oil Fields | KOC | Al Musairie National Co. / SK Engineering | 19.08.2015 | Executed | |
37 | Construction of West Kuwait Mega Complex - Man Power Supply for Concrete Works | KOC | Al-Enma'a Real Estate Co. (KSCC) | 05.07.2015 | Executed | |
38 | Contract No. KU-KNPC-SHFP-SC-003/004 - Manual Excavation and Backfilling Works in MAA | KNPC | Naser M.AL-Baddah & Partner Gen. Trdg. | 01.05.2015 | Executed | |
39 | Civil Works in GC-25 North Kuwait - Manual Excavation and Backfilling, Man Power Supply for Concrete Works | KOC | Bader Al-Mulla & Brothers Co. WLL | 15.12.2015 | Executed | |
40 | Supply of Skilled and Unskilled Labourers for Excavation of Slit Trenches | KOC/KNPC | Vision Intl. General Trading. / AMEC | 24.02.2015 | Executed | |
41 | Execution of Manual Excavation and Backfilling | KNPC | INCO-LABS (KSCC) | 05.01.2015 | Executed | |
42 | Clean Fuel Project | KNPC | HEISCO General Trading co | 20.08.2014 | Executed | |
29 | Elevated Substation Project P-129 | KOC | IMCO Contracting Company | 14.4.2014 | Executed | |
30 | Civil Subcontractor for WARA presure maintenance project at Burgan oil field kuwai | KOC | H.O.T Kuwait | 02.6.2013 | Executed | |
31 | Major maintenance project at north kuwait | KOC | Naser M.AL-Baddah & Partner General Trdg & Cont. w.l.l | 14.5.2013 | Executed | |
32 | Haloon phase project KNPC-SC-CO-021 at Mina Ahmadi , Shuaiba,Abdulla | KNPC | Hanwa engineering and construction co | 10.7.2012 | Executed | |
33 | Mechanical Pre-Fabrication and Erection works New 30" Crude Transit Line (TL-4) | KOC | 10.01.2012 | Executed | ||
34 | Manual Excavation works for ABB civil work project at point-A, KADMA,CMM,NTF,GC-15,GC-23,GC-24 and GC-25 . | KOC | AL Musairie Nationl Gen . Trdg. Cont Co . | 08.01.2012 | Executed | |
35 | Execution of soil excavation for New Houses at South Ahmadi Project . | KOC | INCO-LAB | 04.10.2011 | Executed | |
36 | Pipeline & Civil Works - Replacement of Flow Line Between RCV Manifold & Header at GC9 & GC10 for KOC Service Order Nos. FL/MECC/001 and FL/MECC/002 | KOC | Mechanical Engineering & Contracting Company. | 08.06.2011 | Executed | |
37 | Manpower supply for ABB civil work project at Point-A,KADMA,CMM NTF ,GC -15 GC-23,GC-24 and GC-25 . | KOC | AL Musairie Nationl Gen . Trdg. Cont Co | 26.05.2011 | Executed | |
38 | New BS-132 at North Kuwait - Manual Excavation for Civil Construction Works. | KOC | Naser M.AL-Baddah & Partner General Trdg & Cont. w.l.l | 22.10.2011 | Executed | |
39 | KNPC - CA-CSPD-0007/CIVIL -Work | KOC | Petrocon General Trad. & Contracting Co.W.L.L . | 05.10.2011 | Executed | |
40 | Manual Excavation Contract - Manual Excavation for Civil Construction Works. | KNPC | Arab Contractors | 10.09.2011 | Executed | |
41 | KNPC MAA Refinery - Laying of Cables, Excavation, Backfilling and Supply of Manpower. | KOC | Specialist Oilfield Services (SOS) | 16.05.2010 | Executed | |
42 | Improvement and modification of power distribution system at GC-23, North Kuwait. Manual Excavation. | KOC | O & G Engineering W.L.L. | 20.05.2010 | Executed | |
43 | New Booster Station BS-132 & Enhancements to BS-131,NK Inspection & Slit Trenching-(Manual Excavation in Normal Soil & Backfilling works ) . | KOC | SK Engineering & Construction Co. | 11.04.2010 | Executed | |
44 | civil excavation and backfilling work in oil and gas field located in North , West & South -East kuwait which in coming under the well surveillance team of Kuwait Oil Company . | KOC | AL-BARAKAT GOLDEN GENERAL TRADING & CONT CO. | 27.11.2010 | Executed | |
45 | Wimax & V-Monitor Installations Work at KOC | KOC | WOOD GROUB ESP, INC (Kuwait) | 02.09.2010 | Executed | |
46 | EPC For Upgradation of Fire & Gas Detection and Suppression for 34 Critical Machines at MAA Refinery. CIVIL WORKS | KNPC | ABJ Engineering & Contracting Co. | 01.12.2009 | Executed | |
47 | DAELIM-Replacement of 9 Crude Oil Filling Lines-Civil and Building Works for In-Plant Areas-Package 'A' and Mechanical Works. | DAELIM - KOC | Heavy Engineering Industries & Shipbuilding Co | 04.11.2009 | Executed | |
48 | Replacement of 18" Crude Export Line From GC - 20 Up To North Tank Farm KOC | KOC | Almeer Technical Services | 06.10.2009 | Executed | |
49 | KNPC - New Office Building at Mina Al Ahmadi - Concrete & Asphalting Works CA/PD/3676 | KNPC | Kuwait Dynamics Limited for Contracting Co | 14.05.2009 | Executed | |
50 | Replacement of Crude Transitline from GC-07 to M/F TB-1 | KOC | Heavy Engineering Industries & Shipbuilding Co. | 16.04.2009 | Executed | |
51 | Installation & Maintenance of Ductile Iron Pipes at Doha MEW Contract MEW/3715/2007-2008 | MEW | Turki Al-Dabbous & Sons Co. | 29.2.2009 | Executed | |
52 | Asphalt Road Work and Bitumen Sand Mix for Bund Wall CA/PD/3570 | KNPC | Almeer Technical Services | 08.2.2009 | Executed | |
53 | DAELIM - Replacement of 9 Crude Oil Filling Lines. for Earth Works - Mechanical Excavation and Backfilling. | KOC | Heavy Engineering Industries & Shipbuilding Co. | 19.12.2008 | Executed | |
54 | KOC Contract - Facility Upgrade and Relocation of U/G Process Piping for GCs & BS.- Additional Civil Construction Works for FMP | KOC | SK Engineering & Construction Co | 28.09.2008 | Executed | |
55 | Manual Excavation & Cable Pulling Works at KNPC | KNPC | Alghanim International Gen. Trading & Contracting Co. | 05.08.2008 | Executed | |
56 | Construction & Maintenance of Pipeline and Tanks for Potable Water - phase B-lll | KNPC | Al Magwa Engineering & Cont. Co. | 10.07.2008 | Executed | |
57 | KNPC Contract # CA/PD/3678 - Manual Excavation at MAA Ref. | KNPC | INCO-LAB | 05.07.2008 | Executed | |
58 | KOC Project EF 1769- Manual Excavation in BS-131 and BS-132 | KOC | INCO-LAB | 23.08.2008 | Executed | |
59 | KOC Project EF 1769 - Manual Excavation in GC-7 and GC-8 | KOC | INCO-LAB | 23.07.2008 | Executed | |
60 | Replacement of Old Power & Lighting Panels and Transformers in Shuaiba Refinery. Title-CS-1868 | KNPC - Shuaiba Refinery | Finesco International Gen. Trad. & Contracting Co. | 28.06.2008 | Executed | |
61 | Installation of Ductile Iron Pipes [Aromatics Off Plot Project - Civil Works] KPPC/OP-01/2007 Services-Civil | Kuwait Paraxylene Production Co. KPPC | Petrocon Trad. & Contracting Co | 04.05.2008 | Executed | |
62 | Modernization of Obsolete Instrumentation Project (MOIP Phase-1) at Mina Al Ahmadi Refinery. Casting Concrete Slab on Grade and Laying of Cables etc; | KNPC | Almeer Technical Services | 11.04.2008 | Executed | |
63 | Upgrading/Modification to Tankage, Injection Pump Seal, Water Drainage System at MWIP-West Kuwait. EPD/CC-1148-PO-22 | KOC | Almeer Technical Services | 22.02.2008 | Executed | |
64 | Construction & Maintenance of Pipeline and Tanks for Potable Water - phase B-lll | M.P.W | Green Line Trading &Contracting Co. | 20.02.2007 | Executed | |
65 | KOC Contract for Oil-filled/XLPE/Fiber Optic Cable Pulling and Cable Laying, Length: 72 KM (GC-01 & 02). | KOC | SK Engineering & Construction Co. | 26.04.2007 | Executed | |
66 | KNPC Contracrt-PD Standby Project Services - Civil Works. | KNPC | ABJ Engineering & Contracting Co. | 05.06.2007 | Executed | |
67 | KOC Contract for Civil and Piping Works inside KOC North Tank, South Tank and ADM Area. | KOC | Al-Musairie National | 01.08.2007 | Executed | |
68 | KNPC Contract No. CS/PD/1805 - Under Ground Communication Cable Route for ECCC, CCR | KNPC | Almeer Technical Services | 22.08.2007 | Executed | |
69 | KNPC Contract -PD Standby Project Services WR-034 - Civil-Electrical Works at PIC | KNPC | Almeer Technical Services | 22.08.2007 | Executed | |
70 | KOC Contract for Civil and Piping Works in GC-28 | KOC | Al-Musairie National | 1.10.2007 | Executed | |
71 | KOC Contract Gas Telemetry Project. | KOC | Sultan Asad Mohd. Est. | 28.10.2007 | Executed | |
72 | KOC Corrosion & Scale Monitoring and Inhibitor Injection Package for SEK GC's (14 Nos.) | KOC | Almeer Technical Services | 17.11.2007 | Executed | |
73 | KOC Contract 33388 - Installation of New 20" Gas Oil Pipeline from MAA to New Gas Turbine Station at Subiyah Power Station. Subcontract 33388-00-CI-CN-001 - Supply of Manpower and Equipment. | KNPC - Shuaiba Refinery | Metalex Construction Industry | 01.11.2007 | Executed | |
74 | Water Disposal Facility at Wafra, JO Contract No. JO/HC014/MP03 - Civil Work for Central Control Room. Subcontract No. AE/C-904/UGPSC/006 | JOINT OPERATIONS | Arabi Enertech KSC | 18.06.2006 | Executed | |
75 | KOC Facility Upgrade & Relocation of U/G Process Piping Sub-contract No. JI-180/CMEI/01 Petrofac. Civil Construction, Infrastructure Works. | KOC-Petrofac. | Kharafi National Co. for Mechanical & Electrical Work. | 06.07.2006 | Executed | |
76 | Facility Upgrade and relocation of U/G Process Piping Civil Earth Works,Subcontract No.1292/A/006 | KOC/Petrofac | Kharafi National Co. for Mechanical & Electrical Work. | 24.01.2006 | Executed | |
77 | Civil Works for Facility Upgarde Project (FUP) - Construction of Bund Wall | KOC / Petrofac | The National Company for Mech.&Electrical Works | 10.07.2006 | Executed | |
78 | KOC Contract for the development U.G. facilities at GC-10 and GC-19 - Civil & Pipiline Works | KOC | First Kuwait General Trading & Contracting Co.. | 15.11.2006 | Executed | |
79 | KOC Effluent Water Disposal Plants in the South East Kuwait Fields. | KOC | Kharafi National Co. for Mechanical & Electrical Work. | 23.02.2005 | Executed | |
80 | Steam Flood Facilities. JO Contract NO. JO/HC36R/MP04-KN - Civil Work, | JOINT OPERATIONS | Kharafi National Co. for Mechanical & Electrical Work. | 19.06.2005 | Executed | |
81 | KOC-Replacement of NK Crude Oil Export System, Pipeline Project, North Kuwait. Ref: 1227/A/002. | KOC | Kharafi National Co. for Mechanical & Electrical Work. | 25.05.2004 | Executed | |
82 | M & E Construction Works for upgrading of Booster Station 131 as part of rebuilding of damaged facilities at GC-15 & upgrading Booster Station BS-130 for KOC Control Rooms. | KOC | Kharafi National Co. for Mechanical & Electrical Work. | 01.09.2004 | Executed | |
83 | Civil Works for Flow Line at Ahmadi Oilfield Area, North Kuwait - | KOC | Combined Group Company. | 08.12.2003 | Executed | |
84 | Civil and Associated Works Extension of Headers at SEK GC's (Area 3) | KOC | House of Trade & Contracting Company. | 28.12.2003 | Executed | |
85 | KOC Project - Civil Works & Pipe Line. | KOC | Combined Group Company. | 01.11.2003 | Executed | |
86 | KOC, Effluent Water Disposal Plant - Pipeline & Civil Works, Control Building. | KOC | Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure. | 23.10.2003 | Executed | |
87 | KOC Effluent Water Disposal Plant - Pipeline & Civil Works. | KOC | Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure. | 06.09.2003 | Executed | |
88 | Temporary Net Work for Fresh and Brackish Water, Kuwait Sanitary Sewer Renovation, Phase 4, Part B (Salmiya & Rumaithiya) SE/48 | M.P.W. | Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure | 10.08.2003 | Executed | |
89 | Kuwait Sanitary Sewer Renovation Phase 4, Part B (Salmiya & Rumaithiya) SE/48 - Excavation, Covering, Pipe Laying, Testing, Washing, Disinfection of Water Lines and Links and Backfilling. | M.P.W | Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure | 15.07.2003 | Executed | |
90 | KOC Effluent Water Disposal Plants Project - Al Mughwa and Burgan Area - Civil and Pipeline Works. | KOC | Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure | 23.2.2003 | Executed | |
91 | Civil Works & Slit Trenching for Cable Laying improvement of Unit B - Ahmadi Area. | PIC | Kharafi National Co. for Mechanical & Electrical Work. | 10.11.2002 | Executed | |
92 | Lift Gas Distribution System - Contract No. Ref:1156/a/002 - Pipeline &Civil Works. | KOC | Kharafi National Co. for Mechanical & Electrical Work. | 10.11.2002 | Executed | |
93 | Civil & Pipeline Works inside and outside GCs, GC-16,17,27,28 and Managish Water Pumping Station. | KOC | Consolidated Contractors Co. | 19.09.2002 | Executed | |
94 | Gas Distribution System Project - Al Rowdhatain and Saberiya Civil Works (Control Rooms). | KNPC | Al Fuleij United Group Co. | 26.07.2002 | Executed | |
95 | Civil Work in Gas Pumping Project Station No. 131 Rowdhatain and Saberia. | KOC | Consolidated Contractors Co. | 12.06.2002 | Executed | |
96 | Cable Pulling Works for Electrical and Instrumentation Cable PIC Urea Plant B, Second Granulation Project Shuaiba Industrial Area - Kuwait. | PIC | Kharafi National Co. for Mechanical & Electrical Work. | 22.04.2002 | Executed | |
97 | Pipeline & Civil Works - Replacement of Flow Line Between RCV Manifold & Header at GC9 & GC10 for KOC Service Order Nos. FL/MECC/001 and FL/MECC/002 | KOC | Mechanical Engineering & Contracting Company. | 06.3.2002 | Executed | |
98 | Civil Works at GC 23, 15 and 25 North Kuwait inside and outside the GCs (Electrical Room and Supervisory Building). | KOC | Al Muthairi National General Trading & Contracting Co | 17.1.2002 | Executed |