Project Details

List of Current / Executed Projects

S/N
Projects Description Client Main Contractor Date of Contract Status
1 Project to establish the headquarters offices of the Kuwait Drilling Fluids and Oil Services Company KNPC KBCC 01-07-2024 Ongoing
2 Construction, implementation and maintenance of infrastructure and road works for the industrial area of Sabah Al-Ahmad Industrial City Project Ministry of Defense TECO CONSTRUCT 29-04-2024 Ongoing
3 Afra Complex (Hissa Al Mubarak) Ministry of Defense International Construction Systems Company for General Trading and Contracting 01-06-2024 Ongoing
4 Project to establish, complete and maintain services, infrastructure and public buildings for the suburb center, Al-Mutlaa site Ministry of Defense Golden Generations Company 01-06-2024 Ongoing
5 CONCRETE WORKS FOR KOC CONTRACT NO .22058615-EXPANSION OF WARA WATER INJECTION SYSTEM IN S&EK AREA- KUWAIT KOC MARK TECHNOLOGIES GENEARAL TRADING & CONTRACTING CO W.L.L 15-06-2023 Ongoing
6 Construction and construction of Al-Riyadi Stadium in Fahaheel Ministry of Defense Kuwait Industrial Centre Co 28-08-2023 Executed
7 REPAIR AND REHABILITATION WORKS FOR THE WAVE DEFLECTOR SEA WALL AT SHUIBA OIL PIER Ministry of Defense ALKOUT INTERNATIONAL 23.05.2023 Ongoing
8 Construction of logistics and transportation warehouses for the US Army, Sabhan Ministry of Defense ALHAMRA KUWAIT CO. W.L.L 05.04.2023 Ongoing
9 ALWAFRA PROJECT KUWAIT ( PO NO : WJO/PA14-SCO-015 UNITED GROUP ) Ministry of Defense ALKHORAYEF COMPANY 13.09.2022 Executed
10 EAST SABAH AHMAD HOUSING PROJECT Ministry of Defense SINOHYDRO ENGINEERING BUREU 8 CO., LTD 03.08.2022 Executed
11 P.272:Limak-Cast - insitu Concrete W Ministry of Defense NBTC 22.08.2021 Executed
12 Umm Al Hayman Wastewater Project Ministry of Defense TEIXEIRA DUARTE COMPANY 12.12.2021 Executed
13 CNPC- 2020-154- GC9, GC-10, GC-19,&GC-21 KOC ALKHORAYEF COMPANY 14.07.2020 Executed
14 GC-19,&GC-21 GC-32 Construction of New Gathering Center for SEK (Main Contract # 17051820) Reinforced Concrete for Pipe Racks, Tanks, Sump Pits, Equipment Foundations KOC United Gulf Construction Co. / Petrofac Intl. 28.08.2018 Executed
15 ASSIMA PROJECT: Steel Reinforcement works for Assima Tower. SALHIA REAL ESTATE CO. Ahmadiah Contracting and Trading Company 14.11.2017 Ongoing
16 General Construction works for the Compressors, Utilities and Interconnecting Sub-Areas and EPC for the API Tanks of the EPC&C of Gas Train 5 Project at MAA Refinery. KNPC Heavy Engineering Industries & Shipbuilding Co. 26.07.2017 Ongoing
17 Manual Excavation for Cable Trenches at Mina Abdulah Refinery as per KNPC /FDH safety Standard, Manual Backfilling works. KNPC Integral Services Co. 26.04.2017 Ongoing
18 Civil Work at KNPC - Construction works for Crude Units 01 and Unit 21 in Alzor Refinery KIPIC Combined Group Company. 01.03.2017 Ongoing
19 Manpower Supply for Reinforced Concrete - Shuttering & Steel bar bending and Fixing for Foundations. Manual Back Filling with Compaction ( KOC Compaction Standard). KOC Al- Yousifi 27.02.2017 Executed
20 Lower Fars Heavy Oil Development Project Phase 1. for Fabrication, Installation of re-bar & Formworks, Casting & Curing for Reinforced Cement Concrete work according to KOC specification, approved drawings & Alghanim/Petrofac/ KOC instruction. KOC Alghanim International Co 7.02.2017 Executed
21 KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Cable Pulling Works. KNPC Kharafi National KSC 6.02.2017 Ongoing
22 KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Execution of Clean Fuels Projects - MAA Refinery - Manual Excavation for Civil Construction Works. KNPC Kharafi National KSC 15.01.2017 Ongoing
23 KNPC - JGSK - CFP - Clean Fules Projects - MAA Refinery - Brown Field Works. Manual Excavation for Slit Trench Works. KNPC Kharafi National KSC 07.12.2016 Ongoing
24 KNPC CLEAN FUEL PROJECT: Manual Excavation for Slit Trenches, Manual Backfilling, Manpower Supply for General Labourer, Manpower Supply for Scaffolders, Reinforced Concrete KNPC Sayed Hamid Behbehani & Sons Co. W.L.L 14. 10. 2016 Ongoing
25 CMEI Works for Manifold group trunk-line system for GC-30 & GC - 31 Order Confirmation - Precast Works for Pipe Supports for Flow Line & Box Culverts for GC - 30 & GC 31 KOC Nasser M. Al - Baddah & Partner Gen. Trad 14.9.2016 Executed
26 Manual Excavation Works and Backfilling with Compaction as per KNPC Standard for KNPC MAA Location. KNPC Wataniya Environmental Services Co 16.8.2016 Executed
27 Mechanical, Electrical & Instrumentation ( CMEI) works for ISS 3 Area related to Lower Fars Heavy Oil Development Program (Phase 1) Order Confirmation - Precast Works for Rest Sleepers KOC Nasser M. Al - Baddah & Partner Gen. Trad 04.8.2016 Executed
28 Manual Excavation in Normal Soil. KOC-LFHOD Export Oil facilities. KOC Naser M. Al-Baddah & Partner 25.09.2016 Executed
29 Construction of New Export Transit Pipelines from New BS-171 to AGRP MAA - Manual Excavation and Other Civil Works KOC Consolidated Contractors Company 12.08.2016 Executed
30 Supply of Skilled and Unskilled Labours for Excavation of Slit Trenches KOC/KNPC Vision Intl. Gen Trading. / AMEC 01.07.2016 Executed
31 Supply of Skilled Manpower for Offshore Work in Sulphur Handling Facilities Project in MAA Refinery KNPCC AFCONS Infrastructure Limited 10.04.2016 Executed
32 Civil, Structural, Mechanical, Piping, Electrical, Instrumentation & Telecom construction works including Testing and Pre-Commissioning Pertaining to Manifold and associated Subgroup Manifolds for the GC 29-KUWAIT OIL COMPANY (K.S.C) KOC O & G Engineering W.L.L. 10.02.2016 Ongoing
33 Clean Fuels Project - MAA Refinery, Brown Field Works - Excavation Works for Civil Construction Works KNPC Kharafi National Co. / JGSK Joint Venture 22.11.2015 Ongoing
34 Clean Fuels Project - MAA Refinery, Brown Field Works - Excavation Works for Slit Trenches KNPC Kharafi National Co / JGSK Joint Venture. 29.08.2015 Ongoing
35 Excavation and Cable Trenching for KOC Telemetery Project in KNPC KOC Al Musairie National Co. / DAELIM 28.7.2015 Executed
36 Elevated Substations in SEK - Excavation/Backfilling, Tiles Removal/Laying Works Burgan Oil Fields KOC Al Musairie National Co. / SK Engineering 19.08.2015 Executed
37 Construction of West Kuwait Mega Complex - Man Power Supply for Concrete Works KOC Al-Enma'a Real Estate Co. (KSCC) 05.07.2015 Executed
38 Contract No. KU-KNPC-SHFP-SC-003/004 - Manual Excavation and Backfilling Works in MAA KNPC Naser M.AL-Baddah & Partner Gen. Trdg. 01.05.2015 Executed
39 Civil Works in GC-25 North Kuwait - Manual Excavation and Backfilling, Man Power Supply for Concrete Works KOC Bader Al-Mulla & Brothers Co. WLL 15.12.2015 Executed
40 Supply of Skilled and Unskilled Labourers for Excavation of Slit Trenches KOC/KNPC Vision Intl. General Trading. / AMEC 24.02.2015 Executed
41 Execution of Manual Excavation and Backfilling KNPC INCO-LABS (KSCC) 05.01.2015 Executed
42 Clean Fuel Project KNPC HEISCO General Trading co 20.08.2014 Executed
29 Elevated Substation Project P-129 KOC IMCO Contracting Company 14.4.2014 Executed
30 Civil Subcontractor for WARA presure maintenance project at Burgan oil field kuwai KOC H.O.T Kuwait 02.6.2013 Executed
31 Major maintenance project at north kuwait KOC Naser M.AL-Baddah & Partner General Trdg & Cont. w.l.l 14.5.2013 Executed
32 Haloon phase project KNPC-SC-CO-021 at Mina Ahmadi , Shuaiba,Abdulla KNPC Hanwa engineering and construction co 10.7.2012 Executed
33 Mechanical Pre-Fabrication and Erection works New 30" Crude Transit Line (TL-4) KOC 10.01.2012 Executed
34 Manual Excavation works for ABB civil work project at point-A, KADMA,CMM,NTF,GC-15,GC-23,GC-24 and GC-25 . KOC AL Musairie Nationl Gen . Trdg. Cont Co . 08.01.2012 Executed
35 Execution of soil excavation for New Houses at South Ahmadi Project . KOC INCO-LAB 04.10.2011 Executed
36 Pipeline & Civil Works - Replacement of Flow Line Between RCV Manifold & Header at GC9 & GC10 for KOC Service Order Nos. FL/MECC/001 and FL/MECC/002 KOC Mechanical Engineering & Contracting Company. 08.06.2011 Executed
37 Manpower supply for ABB civil work project at Point-A,KADMA,CMM NTF ,GC -15 GC-23,GC-24 and GC-25 . KOC AL Musairie Nationl Gen . Trdg. Cont Co 26.05.2011 Executed
38 New BS-132 at North Kuwait - Manual Excavation for Civil Construction Works. KOC Naser M.AL-Baddah & Partner General Trdg & Cont. w.l.l 22.10.2011 Executed
39 KNPC - CA-CSPD-0007/CIVIL -Work KOC Petrocon General Trad. & Contracting Co.W.L.L . 05.10.2011 Executed
40 Manual Excavation Contract - Manual Excavation for Civil Construction Works. KNPC Arab Contractors 10.09.2011 Executed
41 KNPC MAA Refinery - Laying of Cables, Excavation, Backfilling and Supply of Manpower. KOC Specialist Oilfield Services (SOS) 16.05.2010 Executed
42 Improvement and modification of power distribution system at GC-23, North Kuwait. Manual Excavation. KOC O & G Engineering W.L.L. 20.05.2010 Executed
43 New Booster Station BS-132 & Enhancements to BS-131,NK Inspection & Slit Trenching-(Manual Excavation in Normal Soil & Backfilling works ) . KOC SK Engineering & Construction Co. 11.04.2010 Executed
44 civil excavation and backfilling work in oil and gas field located in North , West & South -East kuwait which in coming under the well surveillance team of Kuwait Oil Company . KOC AL-BARAKAT GOLDEN GENERAL TRADING & CONT CO. 27.11.2010 Executed
45 Wimax & V-Monitor Installations Work at KOC KOC WOOD GROUB ESP, INC (Kuwait) 02.09.2010 Executed
46 EPC For Upgradation of Fire & Gas Detection and Suppression for 34 Critical Machines at MAA Refinery. CIVIL WORKS KNPC ABJ Engineering & Contracting Co. 01.12.2009 Executed
47 DAELIM-Replacement of 9 Crude Oil Filling Lines-Civil and Building Works for In-Plant Areas-Package 'A' and Mechanical Works. DAELIM - KOC Heavy Engineering Industries & Shipbuilding Co 04.11.2009 Executed
48 Replacement of 18" Crude Export Line From GC - 20 Up To North Tank Farm KOC KOC Almeer Technical Services 06.10.2009 Executed
49 KNPC - New Office Building at Mina Al Ahmadi - Concrete & Asphalting Works CA/PD/3676 KNPC Kuwait Dynamics Limited for Contracting Co 14.05.2009 Executed
50 Replacement of Crude Transitline from GC-07 to M/F TB-1 KOC Heavy Engineering Industries & Shipbuilding Co. 16.04.2009 Executed
51 Installation & Maintenance of Ductile Iron Pipes at Doha MEW Contract MEW/3715/2007-2008 MEW Turki Al-Dabbous & Sons Co. 29.2.2009 Executed
52 Asphalt Road Work and Bitumen Sand Mix for Bund Wall CA/PD/3570 KNPC Almeer Technical Services 08.2.2009 Executed
53 DAELIM - Replacement of 9 Crude Oil Filling Lines. for Earth Works - Mechanical Excavation and Backfilling. KOC Heavy Engineering Industries & Shipbuilding Co. 19.12.2008 Executed
54 KOC Contract - Facility Upgrade and Relocation of U/G Process Piping for GCs & BS.- Additional Civil Construction Works for FMP KOC SK Engineering & Construction Co 28.09.2008 Executed
55 Manual Excavation & Cable Pulling Works at KNPC KNPC Alghanim International Gen. Trading & Contracting Co. 05.08.2008 Executed
56 Construction & Maintenance of Pipeline and Tanks for Potable Water - phase B-lll KNPC Al Magwa Engineering & Cont. Co. 10.07.2008 Executed
57 KNPC Contract # CA/PD/3678 - Manual Excavation at MAA Ref. KNPC INCO-LAB 05.07.2008 Executed
58 KOC Project EF 1769- Manual Excavation in BS-131 and BS-132 KOC INCO-LAB 23.08.2008 Executed
59 KOC Project EF 1769 - Manual Excavation in GC-7 and GC-8 KOC INCO-LAB 23.07.2008 Executed
60 Replacement of Old Power & Lighting Panels and Transformers in Shuaiba Refinery. Title-CS-1868 KNPC - Shuaiba Refinery Finesco International Gen. Trad. & Contracting Co. 28.06.2008 Executed
61 Installation of Ductile Iron Pipes [Aromatics Off Plot Project - Civil Works] KPPC/OP-01/2007 Services-Civil Kuwait Paraxylene Production Co. KPPC Petrocon Trad. & Contracting Co 04.05.2008 Executed
62 Modernization of Obsolete Instrumentation Project (MOIP Phase-1) at Mina Al Ahmadi Refinery. Casting Concrete Slab on Grade and Laying of Cables etc; KNPC Almeer Technical Services 11.04.2008 Executed
63 Upgrading/Modification to Tankage, Injection Pump Seal, Water Drainage System at MWIP-West Kuwait. EPD/CC-1148-PO-22 KOC Almeer Technical Services 22.02.2008 Executed
64 Construction & Maintenance of Pipeline and Tanks for Potable Water - phase B-lll M.P.W Green Line Trading &Contracting Co. 20.02.2007 Executed
65 KOC Contract for Oil-filled/XLPE/Fiber Optic Cable Pulling and Cable Laying, Length: 72 KM (GC-01 & 02). KOC SK Engineering & Construction Co. 26.04.2007 Executed
66 KNPC Contracrt-PD Standby Project Services - Civil Works. KNPC ABJ Engineering & Contracting Co. 05.06.2007 Executed
67 KOC Contract for Civil and Piping Works inside KOC North Tank, South Tank and ADM Area. KOC Al-Musairie National 01.08.2007 Executed
68 KNPC Contract No. CS/PD/1805 - Under Ground Communication Cable Route for ECCC, CCR KNPC Almeer Technical Services 22.08.2007 Executed
69 KNPC Contract -PD Standby Project Services WR-034 - Civil-Electrical Works at PIC KNPC Almeer Technical Services 22.08.2007 Executed
70 KOC Contract for Civil and Piping Works in GC-28 KOC Al-Musairie National 1.10.2007 Executed
71 KOC Contract Gas Telemetry Project. KOC Sultan Asad Mohd. Est. 28.10.2007 Executed
72 KOC Corrosion & Scale Monitoring and Inhibitor Injection Package for SEK GC's (14 Nos.) KOC Almeer Technical Services 17.11.2007 Executed
73 KOC Contract 33388 - Installation of New 20" Gas Oil Pipeline from MAA to New Gas Turbine Station at Subiyah Power Station. Subcontract 33388-00-CI-CN-001 - Supply of Manpower and Equipment. KNPC - Shuaiba Refinery Metalex Construction Industry 01.11.2007 Executed
74 Water Disposal Facility at Wafra, JO Contract No. JO/HC014/MP03 - Civil Work for Central Control Room. Subcontract No. AE/C-904/UGPSC/006 JOINT OPERATIONS Arabi Enertech KSC 18.06.2006 Executed
75 KOC Facility Upgrade & Relocation of U/G Process Piping Sub-contract No. JI-180/CMEI/01 Petrofac. Civil Construction, Infrastructure Works. KOC-Petrofac. Kharafi National Co. for Mechanical & Electrical Work. 06.07.2006 Executed
76 Facility Upgrade and relocation of U/G Process Piping Civil Earth Works,Subcontract No.1292/A/006 KOC/Petrofac Kharafi National Co. for Mechanical & Electrical Work. 24.01.2006 Executed
77 Civil Works for Facility Upgarde Project (FUP) - Construction of Bund Wall KOC / Petrofac The National Company for Mech.&Electrical Works 10.07.2006 Executed
78 KOC Contract for the development U.G. facilities at GC-10 and GC-19 - Civil & Pipiline Works KOC First Kuwait General Trading & Contracting Co.. 15.11.2006 Executed
79 KOC Effluent Water Disposal Plants in the South East Kuwait Fields. KOC Kharafi National Co. for Mechanical & Electrical Work. 23.02.2005 Executed
80 Steam Flood Facilities. JO Contract NO. JO/HC36R/MP04-KN - Civil Work, JOINT OPERATIONS Kharafi National Co. for Mechanical & Electrical Work. 19.06.2005 Executed
81 KOC-Replacement of NK Crude Oil Export System, Pipeline Project, North Kuwait. Ref: 1227/A/002. KOC Kharafi National Co. for Mechanical & Electrical Work. 25.05.2004 Executed
82 M & E Construction Works for upgrading of Booster Station 131 as part of rebuilding of damaged facilities at GC-15 & upgrading Booster Station BS-130 for KOC Control Rooms. KOC Kharafi National Co. for Mechanical & Electrical Work. 01.09.2004 Executed
83 Civil Works for Flow Line at Ahmadi Oilfield Area, North Kuwait - KOC Combined Group Company. 08.12.2003 Executed
84 Civil and Associated Works Extension of Headers at SEK GC's (Area 3) KOC House of Trade & Contracting Company. 28.12.2003 Executed
85 KOC Project - Civil Works & Pipe Line. KOC Combined Group Company. 01.11.2003 Executed
86 KOC, Effluent Water Disposal Plant - Pipeline & Civil Works, Control Building. KOC Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure. 23.10.2003 Executed
87 KOC Effluent Water Disposal Plant - Pipeline & Civil Works. KOC Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure. 06.09.2003 Executed
88 Temporary Net Work for Fresh and Brackish Water, Kuwait Sanitary Sewer Renovation, Phase 4, Part B (Salmiya & Rumaithiya) SE/48 M.P.W. Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure 10.08.2003 Executed
89 Kuwait Sanitary Sewer Renovation Phase 4, Part B (Salmiya & Rumaithiya) SE/48 - Excavation, Covering, Pipe Laying, Testing, Washing, Disinfection of Water Lines and Links and Backfilling. M.P.W Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure 15.07.2003 Executed
90 KOC Effluent Water Disposal Plants Project - Al Mughwa and Burgan Area - Civil and Pipeline Works. KOC Mohammed Abdul Mohsin Al Kharafi & Sons for Gen. Trd. Cont. & Industrial Structure 23.2.2003 Executed
91 Civil Works & Slit Trenching for Cable Laying improvement of Unit B - Ahmadi Area. PIC Kharafi National Co. for Mechanical & Electrical Work. 10.11.2002 Executed
92 Lift Gas Distribution System - Contract No. Ref:1156/a/002 - Pipeline &Civil Works. KOC Kharafi National Co. for Mechanical & Electrical Work. 10.11.2002 Executed
93 Civil & Pipeline Works inside and outside GCs, GC-16,17,27,28 and Managish Water Pumping Station. KOC Consolidated Contractors Co. 19.09.2002 Executed
94 Gas Distribution System Project - Al Rowdhatain and Saberiya Civil Works (Control Rooms). KNPC Al Fuleij United Group Co. 26.07.2002 Executed
95 Civil Work in Gas Pumping Project Station No. 131 Rowdhatain and Saberia. KOC Consolidated Contractors Co. 12.06.2002 Executed
96 Cable Pulling Works for Electrical and Instrumentation Cable PIC Urea Plant B, Second Granulation Project Shuaiba Industrial Area - Kuwait. PIC Kharafi National Co. for Mechanical & Electrical Work. 22.04.2002 Executed
97 Pipeline & Civil Works - Replacement of Flow Line Between RCV Manifold & Header at GC9 & GC10 for KOC Service Order Nos. FL/MECC/001 and FL/MECC/002 KOC Mechanical Engineering & Contracting Company. 06.3.2002 Executed
98 Civil Works at GC 23, 15 and 25 North Kuwait inside and outside the GCs (Electrical Room and Supervisory Building). KOC Al Muthairi National General Trading & Contracting Co 17.1.2002 Executed